top of page
Portfolio available in:

ATUALMENTE

APÓS RECUPERAÇÃO ESTRUTURAL

CLA | FAU

Floor FAU

Project for the structural recovery of the ground floor of the Jorge Machado Moreira building.

​

Elaboration of a structural recovery project of the ground floor of the building with budget estimate.

​

​

​

​

- Project Year: 2008

​

- Client: CLA/FAU

​

- Project Category: Technics

​

- Supervisors: Guilherme Carlos Lassance dos Santos Abreu (DPA–FAU–CLA–UFRJ), Paulo Fernando Neves Rodrigues (DE–FAU–CLA–UFRJ), Wendell Diniz Varela (DE–FAU–CLA–UFRJ). Patricia Figueira Lassance dos Santos (DPUR–FAU–CLA–UFRJ)

​

- Students: David Motta Pereira de Sousa (FAU–CLA–UFRJ), Lidger Alves de Vargas Junior (FAU–CLA–UFRJ), Samuel Nogueira de Medeiros (FAU–CLA–UFRJ), Tayanne Ferreira Telles (FAU–CLA–UFRJ)

​

​

ATUALMENTE

APÓS RECUPERAÇÃO ESTRUTURAL

bottom of page