CCS | IMPG
Luciana Arruda Laboratory
Complete project for two (02) research laboratories and practical courses of the Department of Virology of the Institute of Microbiology Paulo de Góes, UFRJ.
The problem addressed by the students is to acoustically condition the room studied, because due to the high noise level in the place it is necessary to speak very loudly. There is a concern to make students aware of the acoustic quality of the classroom in actual projects relative to the client. The job is to analyze the situation and propose solutions accompanied by a budget. Four (04) stages are defined: problem analysis, in situ investigation (acoustic photography), acoustic calculations, presentation of budget solutions.
The students performed on-site measurements, analyzed the acoustic conditions of the enclosure in question, and proposed insulation solutions to uncomfortable sources.
- Project Year: 08/2006 a 12/2006
- Client: CCS/IMPG
- Project Category: Renovation
- Supervisors: Patricia Figueira Lassance dos Santos Abreu (DPUR–FAU–CLA–UFRJ)
- Students: Roberta Kelly Braga Fernandes Pedrosa (FAU–CLA–UFRJ), Soraia Velasques Pereira(CI–BAU–EBA–CLA–UFRJ), Mariana do Amaral de Oliveira (FAU–CLA–UFRJ)